El Sauzal, Gold Mine

17 tanks for the leaching process in the El Sauzal Gold Mine.

Scope of work: design, engineering, supply, manufacturing, assembly, hydrostatic tests and preparation of As-built plans of 17 carbon steel tanks with the following dimensions: 6 of 2,500 m3, 2 of 1,244 m3 and 9 of 130 m3. Due to the difficulties of access to the job site, the logistics and construction required transporting all the equipment and materials in truck trips with a maximum capacity of 3 tons.