Main Projects of Pipelines 12 "and 6" poliduct pipe relocation on Route 10, Coco-Moro section, zone of Siquirres, Costa Rica Costa Rica Pipelines Under Execution Internacional EPC of a 1.6 km interconnection pipeline from ORF to Eco San Ramón. Mizton, Pipeline Interconnection Under Execution Construction of 10.8 km of 10 ″ diameter offshore to onshore pipelines. Mizton Pipeline EPC to rehabilitate two carbon gas pipelines. Coal Pipeline, Veracruz EPC of 2 pipelines of 12 ″ x 17 km; one of carbon steel and one of HDPE Jamalco Pipelines Internacional Open book that led to an EPC for a Gas Pipeline 42 "in diameter by 452 km in length, los Ramones Los Ramones II Norte, Pipeline Engineering, Procurement and Construction of a 30 ”diameter gas pipeline by 15 km. Branch Line, Tula Engineering, Procurement and Construction of the 36 ”diameter, 27 km Cactus - Trinidad Gas Pipeline. Cactus - Trinidad Gas Pipeline EPC of the 30 ”diameter pipeline by 75.9 km in length. Mayakan Gas Pipeline Construction of 4 Nitroducts Nitrogen Pipelines, Tabasco EPC to replace a 20 "diameter, 28 km long saline pipeline from Tuzandeptl to the Gulf of Mexico Tuzandepetl Saline Pipeline EPC of a Gas Pipeline of 24″ in diameter and 19 km in length to Topolobampo. Branch Line, Topolobampo EPC of a 36” diameter internal distribution header from the 5E Pump House to a Storage Tank in Dos Bocas Maritime Terminal. Internal Distribution Head, TMBD EPC to relocate 11.3 km of 48” diameter gas pipeline in Altamira. Gas Pipeline Relocation, Altamira EPC of a gas pipeline, 30" in diameter x 171 km in length, through Morelos, Puebla and Tlaxcala. Morelos Pipeline Installation of Submarine Line and Marine Diffuser. Marine Diffuser Construction completion, replacement of the 16 "D.N. x 54 + 159.10 km pipeline from the Luna Battery to the Oxiacaque Battery. Pipeline Substitution, Luna - Oxiacaque EPC of a 28 km gas branch pipeline in Hermosillo, Son. Branch line, Hermosillo EPC of infrastructure for the management and transportation of hydrocarbons in the Southern Region. Construction Infrastructure SL-7 EPC of a 30 ”diameter Gas Pipeline by 150 Km from Mier to Monterrey. Nuevo Leon Pipeline (Kinder Morgan)