Client: Administración Portuaria Integral de Altamira
Place: Tamaulipas, México
Engineering, Procurement and Construction to relocate 11.3 km of 48” diameter gas pipeline of the Cactus San Fernando Pipeline. Section between km 799 + 694 and km 809 + 593, to bypass the Industrial Port of Altamira, Tamaulipas.