Branch Line, Topolobampo

Engineering, Procurement and Construction of a Gas Pipeline of 24″ in diameter and 19 km in length.

This Branch transports natural gas from the El Encino-Topolobampo gas pipeline to the Northeast, Topolobampo II and III combined cycle power plants, in the State of Sinaloa.