Main Projects of Pipelines
12 "and 6" poliduct pipe relocation on Route 10, Coco-Moro section, zone of Siquirres, Costa Rica
Costa Rica Pipelines
Under Execution
Internacional
EPC of a 1.6 km interconnection pipeline from ORF to Eco San Ramón.
Mizton, Pipeline Interconnection
Under Execution
Construction of 10.8 km of 10 ″ diameter offshore to onshore pipelines.
Mizton Pipeline
EPC to rehabilitate two carbon gas pipelines.
Coal Pipeline, Veracruz
EPC of 2 pipelines of 12 ″ x 17 km; one of carbon steel and one of HDPE
Jamalco
Pipelines
Internacional
Open book that led to an EPC for a Gas Pipeline 42 "in diameter by 452 km in length, los Ramones
Los Ramones II Norte, Pipeline
Engineering, Procurement and Construction of a 30 ”diameter gas pipeline by 15 km.
Branch Line, Tula
Engineering, Procurement and Construction of the 36 ”diameter, 27 km Cactus - Trinidad Gas Pipeline.
Cactus - Trinidad Gas Pipeline
EPC of the 30 ”diameter pipeline by 75.9 km in length.
Mayakan Gas Pipeline
Construction of 4 Nitroducts
Nitrogen Pipelines, Tabasco
EPC to replace a 20 "diameter, 28 km long saline pipeline from Tuzandeptl to the Gulf of Mexico
Tuzandepetl Saline Pipeline
EPC of a Gas Pipeline of 24″ in diameter and 19 km in length to Topolobampo.
Branch Line, Topolobampo
EPC of a 36” diameter internal distribution header from the 5E Pump House to a Storage Tank in Dos Bocas Maritime Terminal.
Internal Distribution Head, TMBD
EPC to relocate 11.3 km of 48” diameter gas pipeline in Altamira.
Gas Pipeline Relocation, Altamira
EPC of a gas pipeline, 30" in diameter x 171 km in length, through Morelos, Puebla and Tlaxcala.
Morelos Pipeline
Installation of Submarine Line and Marine Diffuser.
Marine Diffuser
Construction completion, replacement of the 16 "D.N. x 54 + 159.10 km pipeline from the Luna Battery to the Oxiacaque Battery.
Pipeline Substitution, Luna - Oxiacaque
EPC of a 28 km gas branch pipeline in Hermosillo, Son.
Branch line, Hermosillo
EPC of infrastructure for the management and transportation of hydrocarbons in the Southern Region.
Construction Infrastructure SL-7
EPC of a 30 ”diameter Gas Pipeline by 150 Km from Mier to Monterrey.