Main Projects of Pipelines
Construction of 2 36” Ø directional crossings; one of 1,202m that crosses the body of water of the Mezcalapa River and the second crossing of 500 meters
MEZCALAPA
8” Pipe for Montego Bay Terminal to Bogue Plant
NFE Jamaica Pipeline
International
12 "and 6" poliduct pipe relocation on Route 10, Coco-Moro section, zone of Siquirres, Costa Rica
Costa Rica Pipelines
International
EPC of a 1.6 km interconnection pipeline from ORF to Eco San Ramón.
Mizton, Pipeline Interconnection
Construction of 10.8 km of 10 ″ diameter offshore to onshore pipelines.
Mizton Pipeline
EPC to rehabilitate two carbon gas pipelines.
Coal Pipeline, Veracruz
EPC of 2 pipelines of 12 ″ x 17 km; one of carbon steel and one of HDPE
Jamalco
Pipelines
International
Open book that led to an EPC for a Gas Pipeline 42 "in diameter by 452 km in length, los Ramones
Los Ramones II Norte, Pipeline
Engineering, Procurement and Construction of a 30 ”diameter gas pipeline by 15 km.
Branch Line, Tula
Engineering, Procurement and Construction of the 36 ”diameter, 27 km Cactus - Trinidad Gas Pipeline.
Cactus - Trinidad Gas Pipeline
EPC of the 30 ”diameter pipeline by 75.9 km in length.
Mayakan Gas Pipeline
Construction of 4 Nitroducts
Nitrogen Pipelines, Tabasco
EPC to replace a 20 "diameter, 28 km long saline pipeline from Tuzandeptl to the Gulf of Mexico
Tuzandepetl Saline Pipeline
EPC of a Gas Pipeline of 24″ in diameter and 19 km in length to Topolobampo.
Branch Line, Topolobampo
EPC of a 36” diameter internal distribution header from the 5E Pump House to a Storage Tank in Dos Bocas Maritime Terminal.
Internal Distribution Head, TMBD
EPC to relocate 11.3 km of 48” diameter gas pipeline in Altamira.
Gas Pipeline Relocation, Altamira
EPC of a gas pipeline, 30" in diameter x 171 km in length, through Morelos, Puebla and Tlaxcala.
Morelos Pipeline
Installation of Submarine Line and Marine Diffuser.
Marine Diffuser
Construction completion, replacement of the 16 "D.N. x 54 + 159.10 km pipeline from the Luna Battery to the Oxiacaque Battery.
Pipeline Substitution, Luna - Oxiacaque
EPC of a 28 km gas branch pipeline in Hermosillo, Son.
Branch line, Hermosillo
EPC of infrastructure for the management and transportation of hydrocarbons in the Southern Region.
Construction Infrastructure SL-7
EPC of a 30 ”diameter Gas Pipeline by 150 Km from Mier to Monterrey.