Oil pipeline line-236 of 36 ″ in diameter and 56 km in length from Pol-A to Litoral Link:
– ILI (in-line-inspection) with UT instrumented equipment to determine pipeline integrity and accurately locate 3 leaks in-line
– Oil pipeline 24 ″ in diameter by 8.8 km in length from Tsimin-A to May-A:
– Permanent repair by installing a metallic envelope with resin in the regular line.
– Definitive repair by replacing the damaged segment in the ascending duct.