Under Execution

Pneumatic Pumping Lines.

Engineering, procurement and construction of two 16 “ø pneumatic pumping gas pipelines in the Yaxché field, includes directional drilling to the offshore and its pipelines are 30km long on the marine side and 900 meters on the land side that connects to a future sweetener of gas.