HDD’s Hokchi

Engineering, Procurement and Construction of five shore approaches from sea to land consisting of production and service pipelines, with lengths of 1,200 and 1,800 meters each, and from 10 to 24 inches in diameter.

By using Horizontal Directional Drilling for the construction of these shore approaches, we guaranteed the least social-environmental impact, building them through a tunnel from an offshore position to a punch out site in land.