Nuevo Leon Pipeline (Kinder Morgan)

Engineering, Procurement and Construction of a 30″ diameter by 150 km long gas pipeline and four measuring stations.

Scope of work: engineering, procurement, permitting, construction of the 15 km pipeline. in the United States and 135 kilometers in Mexico, two crossings by directional drilling, four measurement stations, precommissioning and commissioning of the complete system.