Engineering, Procurement and Construction of the 42” diameter pipeline for 452 Km Los Ramones II Norte.
Main Activities: Two Compression Stations, sectioning valves, double and single devil traps, interconnections; piping, security, control and monitoring systems; electrical, mechanical and civil infrastructure.