Valladolid III Combined Cycle Plant

525 Mw combined cycle generation plant with 2 Toshiba GE 7FA CTG turbines and 1 STG turbine.

Scope of work: site preparation and civil, structural and pipe rack works. Water extraction and injection system including civil, mechanical, electrical and instrumentation works. Design, engineering, procurement and construction of buildings.