Engineering, Procurement and Construction of the 30” diameter pipeline by 75.9 km in length.
Main Activities: EPC, Directional Drilling, Regular Line Construction, Instrumentation & SCADA, cathodic protection, interconnection with existing line at CPG Nuevo Pemex Tabasco, Measurement and Regulation Stations.