Gas compression station with Solar Centaur 50 turbines for phase II of the Mayakán project. IPC and start-up of the project consisting of the CS2 gas compression station, the measurement and delivery station in Valladolid, the integration of the DCS with the existing facilities including the Main Control Center in Mérida. The four project locations are located in an area of 750 kilometers.
Compression Station, Mayakán Phase II
- Client: Gaz de France
- Place: Campeche, México