Tsimin

Tsimin

Inspection with ultrasound in the 263 Line that is 56 km long and 36″ in diameter, this goes from the Pol-A platform to the Enlace Litorial platform, with the purpose of determining the exact location of three existing leaks in the line.

This project also includes the submarine installation of a metallic wrap welded in a duct that is 8.8 kilometers long and 24″ in diameter, that goes from Tsimin-A platform to the May-A platform, to repair an ascending duct from the May-A platform.

Project description

Location: Campeche, Mexico